Remodeling Our Home:

Phase one: Gut everything out.
We are replacing the flooring in our Alpine motor home. The project has now progressed to the point that everything is gutted out, some leak damaged areas have been replaced with new material and the floor has been leveled with a concrete filler and sanded smooth and level.

Here are some photos we have taken along the way:

Before
This is the Before Photo

Demolition
Demolition is Underway
Everything Outside
Everything Has to go Outside
Replacing Floor
Replacing the Water Damaged Floor

Ready
All Smooth and Ready

The next step is to install a high end Vinyl flooring product throughout the coach from the fire wall to the bedroom night stands. The roll of Vinyl was to arrive this afternoon and we are patiently waiting for that to happen.
Meanwhile we are still sleeping in the coach at night. About five we go in with my big shop vac and clean everything and remove the protective sheet on the bed. It is challenging, for everything has been packed in bags and boxes and is stacked under the awning. We can’t find anything.
Stay tuned for Reconstruction.
Gary and Judy